The first thing most factory owners ask about industrial solar is the subsidy. The honest answer is that there usually is not one, and the tax treatment is worth more than the subsidy would have been.

Industrial solar does not get the residential subsidy

PM Surya Ghar Muft Bijli Yojana is a residential scheme. A factory, warehouse, cold store or commercial building does not qualify for its central financial assistance, however the roof is used. Proposals that quote a 78,000 rupee subsidy for an industrial connection have copied a residential template.

What industrial buyers get instead is depreciation. Solar assets are commonly treated at 40 per cent in the first year under the income tax depreciation rules, against 15 per cent for ordinary plant and machinery. For a profitable company that front loads a large part of the tax benefit into year one. Confirm the current rate and your eligibility with your own chartered accountant before you build it into a payback model, because it turns on your tax position rather than on the solar.

Some states run their own industrial incentives, and a few offer capital subsidy for specific categories or districts. These change often. Check your state nodal agency rather than relying on a national figure.

Three ways an industrial user can buy solar

Rooftop Open access Group captive
Typical size 50 kW to 2 MW 1 MW upward 1 MW upward
Capital from you Yes, or through an operating lease None, you buy units 26 per cent equity
Land needed None, uses your roof None None
Approval time Weeks to months Months Months
Cross subsidy surcharge Not applicable Payable Waived
Best when You have roof and daytime load Load is large, roof is small Load is large and long term

Rooftop is the simplest and the fastest. It also has the best economics per unit for a mid sized plant, because you avoid transmission charges entirely by generating where you consume. Open access becomes interesting once your load outgrows your roof.

Net metering above 10 kW is not what most sites assume

This is the part that catches people. The Electricity Rights of Consumers Amendment Rules of June 2021 provide for net metering up to 500 kW, or your sanctioned load, whichever is lower. Above that the rules point to net billing or gross metering, where exported units are bought at a tariff rather than credited one for one.

Two qualifications matter. The central rule operates as guidance to state commissions, and it applies where a state's own regulations are silent. So the real limit is whatever your state regulator has set, and states differ widely. Gujarat and Maharashtra both allow considerably more than 500 kW for some consumer categories.

The practical step is to ask your DISCOM for the current net metering limit for your tariff category, in writing, before sizing the plant. A system sized past the limit exports at a worse rate than the designer assumed.

What compliance you actually need

If the project uses net metering or open access, the modules must be ALMM List-I listed. This is not optional and a non listed module will fail inspection.

From 1 January 2027 the same projects must also use cells from an ALMM List-II manufacturer. A relief window currently runs to 31 December 2026 for net metering and open access projects. If you are commissioning in 2027, ask your module supplier to name the List-II cell source and put it on the purchase order. Our ALMM explainer sets out both lists and what changes.

Domestic content requirement is a separate rule and ALMM compliance does not satisfy it. A module can meet one and fail the other. DCR only applies if the project claims a scheme that requires it, which most purely private industrial installations do not.

A behind the meter installation with no subsidy, no net metering and no open access sits outside the ALMM requirement altogether. That is a narrow case, and worth confirming with your DISCOM rather than assuming.

Sizing a factory roof honestly

Start from your daytime consumption, not your roof area. A plant that runs single shift has a very different load curve from one running three shifts, and solar only serves the hours it generates.

As a planning figure, 1 kW of modules needs roughly 7 to 10 square metres of usable roof once you allow row spacing, walkways and setbacks. A 1,000 square metre shed will not take 140 kW, it will take perhaps 100 to 120.

Industrial rooftops in India typically generate 1,300 to 1,650 units per kilowatt peak per year. That is higher than the residential band, mostly because the arrays are larger, cleaner and less shaded. Our note on commercial system sizing works through a smaller example, and levelised cost of energy is the metric to compare options on rather than cost per watt.

Two structural checks belong at the start, not the end. Whether the roof can carry the additional load, and how many years of life the sheeting has left. Mounting a 25 year asset on sheeting with 6 years left means paying twice to remove and refit it.

What to ask a module supplier

  • Which ALMM List-I model numbers are you supplying, and can I see the listing?
  • Who makes the cells, and are they ALMM List-II listed?
  • What is the temperature coefficient, and what is the first year and annual degradation?
  • What exactly does the warranty cover, product and performance separately, and who honours it?
  • Can I have the datasheet and the IEC test certificates before I order?

A supplier who cannot answer the first two in a single email is not ready for a 2027 commissioning date.

Frequently asked questions

Is there a government subsidy for industrial solar in India?

Not under PM Surya Ghar, which is residential only. Industrial and commercial users generally rely on accelerated depreciation instead, plus any scheme their state offers. Check your state nodal agency for current industrial incentives.

How much roof area does an industrial solar plant need?

Roughly 7 to 10 square metres per kilowatt of modules once spacing and access are allowed for. Higher wattage modules reduce this, which is the main reason they matter on a constrained roof.

Can a factory use net metering?

Often yes, but subject to a cap. The central rules provide for net metering up to 500 kW or sanctioned load, whichever is lower, and state regulators set the operative limit. Ask your DISCOM for the figure that applies to your tariff category.

Do industrial projects need ALMM listed modules?

Yes, if the project uses net metering or open access. From January 2027 those projects also need ALMM List-II cells. A fully behind the meter private installation with no net metering may fall outside the requirement, which is worth confirming in writing.

What payback should an industrial rooftop achieve?

It depends on your tariff, your daytime load share and your tax position, so any single number quoted without those three is marketing. The honest approach is to model it on your own consumption data rather than accept a figure from a brochure.

Where Atal Solar fits

Atal Solar makes N-Type TOPCon modules on a 1.44 GW automated line at Mitana, Tankara, in Morbi district, Gujarat. The modules are ALMM List-I listed and BIS certified, in three series up to 650 Wp. Atal assembles modules and buys cells from specialist cell manufacturers, so for a 2027 commissioning the List-II question above applies to us as much as to any other module maker, and you are entitled to ask it.

Full specifications for each series are on the products pages and the datasheets are on the download page. For project quantities and delivery timelines, talk to our sales team.