These figures assume a rooftop system in reasonable condition, facing roughly south, with no significant shading. They are annual averages. Any single day will be higher or lower.
| System size | Units per day | Units per month | Units per year |
| 1 kW | 3.6 to 4.2 | 110 to 130 | 1,300 to 1,550 |
| 2 kW | 7 to 8.5 | 220 to 260 | 2,600 to 3,100 |
| 3 kW | 11 to 12.5 | 330 to 390 | 3,900 to 4,650 |
| 5 kW | 18 to 21 | 550 to 650 | 6,500 to 7,750 |
| 10 kW | 36 to 42 | 1,100 to 1,300 | 13,000 to 15,500 |
| 100 kW | 360 to 420 | 11,000 to 13,000 | 1.3 to 1.55 lakh |
| 1 MW | 3,600 to 4,200 | 1.1 to 1.3 lakh | 13 to 15.5 lakh |
One unit means one kilowatt hour, the same unit your electricity bill is measured in.
Those are rooftop figures. A ground mounted plant does better, typically 1,500 to 1,700 units per kilowatt peak per year, because the rows can be oriented and spaced ideally instead of fitting whatever roof exists. For plants at that scale our note on 1 MW plant cost uses the ground mount range.
The calculation has two parts. Your system size in kilowatts peak, and the specific yield for your location, measured in units per kilowatt peak per year.
Indian rooftop systems typically land between 1,300 and 1,550 units per kilowatt peak per year. Commercial and industrial rooftops sit at the upper end of that band, partly because they are larger, better maintained and less often shaded. Divide by 365 and you get the daily figure.
Expressed another way, that band is a capacity utilisation factor of roughly 15 to 18 per cent. If you see CUF quoted on a proposal, that is what it means: the fraction of the plant's nameplate output you actually get across a year.
Many installers use four units per kilowatt per day. It is a reasonable national average and it is fine for a first estimate.
It stops being reasonable when it is applied to every state. Western Rajasthan and Kutch can exceed 1,700 units per kilowatt peak per year, which is closer to 4.7 units per kilowatt per day. Parts of the north east sit near 1,100, which is about 3 units. That is a difference of more than 50 per cent between the two ends of the country, and it changes a payback calculation materially.
If a quotation uses four units per kilowatt per day for a site in Assam, the savings figure attached to it is too high.
Location. The largest single factor, and the one you cannot change. Gujarat, Rajasthan and much of the Deccan are at the top of the range. Coastal and north eastern states are lower.
Season. Output in the monsoon can fall 30 to 50 per cent below a clear month. A system that makes 400 units in April may make 220 in July. This is normal and not a fault. Judge a system across a year, not across a fortnight.
Dust. Soiling losses in dry, dusty regions run into double digit percentages between cleans. This is the one loss you have direct control over, which is why cleaning and maintenance earns its place in the schedule.
Shading. A single shaded module can drag down a whole string. A water tank, a parapet or a neighbour's new floor matters more than most people expect.
Temperature. Panels lose output as they get hotter, which is why a 42 degree afternoon in May can generate less than a 32 degree morning. The temperature coefficient on the datasheet tells you how much. N-Type TOPCon modules are less affected here than older Mono PERC, which is one of the practical arguments for the technology rather than a marketing one.
Age. Modules degrade slowly. A first year drop of around 1 per cent followed by roughly 0.4 per cent a year is typical for TOPCon. Over 25 years that compounds, and it is covered in more detail in our note on TOPCon degradation.
A 5 kW rooftop system in Ahmedabad. Specific yield in that area is roughly 1,550 units per kilowatt peak per year.
5 multiplied by 1,550 gives 7,750 units a year, or about 646 a month averaged across the year. In practice you would see perhaps 750 in March and 420 in July.
At a residential tariff of 8 rupees a unit, 7,750 units is about 62,000 rupees of electricity a year. Whether all of that becomes a saving depends on the next section.
Generating a unit and saving the price of a unit are not the same thing.
If you consume the unit as it is generated, you save the full retail tariff. If you export it, you are credited at whatever rate your state allows, and under net metering that credit may be set against future consumption rather than paid out. Some states settle surplus annually at a lower rate than you pay.
The practical consequence: a household that uses most of its power in the evening gets less value from the same generation than a factory running machines at midday. Daytime load is worth more than roof area.
Between 3.6 and 4.2 units a day as an annual average across most of India, so roughly 110 to 130 units a month. In high irradiance areas such as western Rajasthan it can reach 4.7 units a day. In the north east it may be nearer 3.
Around 220 to 260 units a month averaged over a year. Expect more in the dry months and noticeably less through the monsoon.
Roughly 3,600 to 4,200 units a day if it is a rooftop array, or about 13 to 15.5 lakh units a year. A ground mounted 1 MW plant does better, usually 4,000 to 4,600 units a day, which is the figure used in our note on 1 MW plant cost.
Because there is less light. A 30 to 50 per cent fall against a clear month is expected. If output stays low after the rains end, then it is worth checking for soiling, a failed string or a shading change.
Not by itself. Units depend on total installed kilowatts, not on the wattage of each module. A 5 kW system built from 635 Wp modules and one built from 550 Wp modules generate about the same. The higher wattage module simply needs less roof area, which matters when space is tight rather than when generation is.
Take your system size in kilowatts, multiply by the specific yield for your district, and divide by 365 for a daily number. If you do not know the yield, 1,400 is a defensible national starting point and our solar calculator will do the arithmetic.
Then ask any supplier quoting you savings which yield figure they used. If they cannot say, the savings number is decoration.
Atal Solar manufactures N-Type TOPCon modules at a 1.44 GW automated plant at Mitana, Tankara, in Morbi district, Gujarat. Our modules are ALMM List-I listed and BIS certified. Datasheets with full electrical and temperature characteristics are on the download page, and the three series are compared in the G12R and M10R guide.